Skip to content
UGRATARAInfrastructure
Heavy construction plant working on an earthworks site
Capabilities

Plant, people and testing capacity.

Owned plant with planned maintenance, survey and laboratory capability on site, and the disciplines needed to run a project without subcontracting the responsibility.

Plant register

Searchable equipment directory.

Owned fleet. Specialist plant is contracted per project against the same maintenance and certification requirements.

Register pending verification

27 types · 155 units

27 equipment types listed.

Plant and equipment register with make, capacity, quantity and typical deployment
RefEquipmentCapacityQtyTypical deployment
EQ-EM-01

Hydraulic Excavator (20–22 t)

[Sample] Major manufacturer

1.0 m³ bucket8Corridor earthworks, structures excavation
EQ-EM-02

Hydraulic Excavator (30 t, long reach)

[Sample] Major manufacturer

1.4 m³ bucket3River works, deep excavation, slope work
EQ-EM-03

Wheel Loader

[Sample] Major manufacturer

2.5 m³ bucket5Material handling, batching plant feed
EQ-EM-04

Bulldozer

[Sample] Major manufacturer

155 kW class3Bulk earthworks, access track formation
EQ-PV-01

Motor Grader

[Sample] Major manufacturer

3.7 m blade4Subgrade and base course trimming
EQ-PV-02

Vibratory Roller (10–12 t)

[Sample] Major manufacturer

Single drum7Earthworks and pavement layer compaction
EQ-PV-03

Asphalt Paver

[Sample] Major manufacturer

Up to 7 m paving width2Bituminous surfacing
EQ-PV-04

Pneumatic Tyre Roller

[Sample] Major manufacturer

16–20 t3Asphalt finishing compaction
EQ-CN-01

Concrete Batching Plant

[Sample] Major manufacturer

30 m³/hr3Site batching for remote and high-volume projects
EQ-CN-02

Transit Mixer

[Sample] Major manufacturer

6 m³10Concrete delivery
EQ-CN-03

Concrete Boom Pump

[Sample] Major manufacturer

36 m boom2High-rise and structure pours
EQ-CN-04

System Formwork Sets

[Sample] Proprietary system

Slab, wall and column sets12Repetitive floor cycles
EQ-LF-01

Crawler Crane

[Sample] Major manufacturer

80 t2Girder erection, heavy lifts
EQ-LF-02

Mobile Crane

[Sample] Major manufacturer

25–50 t4General lifting across sites
EQ-LF-03

Tower Crane

[Sample] Major manufacturer

8 t at jib root3Building construction
EQ-LF-04

Piling Rig

[Sample] Major manufacturer

Up to 1200 mm dia.2Bored pile foundations
EQ-TR-01

Tipper Truck

[Sample] Major manufacturer

10–16 m³18Material haulage
EQ-TR-02

Low-bed Trailer

[Sample] Major manufacturer

40 t3Plant mobilisation
EQ-TR-03

Water Tanker

[Sample] Major manufacturer

10,000 L5Dust suppression, compaction water
EQ-SV-01

Total Station

[Sample] Major manufacturer

1" angular accuracy8Setting out and as-built survey
EQ-SV-02

GNSS/RTK Survey System

[Sample] Major manufacturer

Centimetre accuracy4Corridor survey and machine guidance
EQ-SV-03

Digital Level

[Sample] Major manufacturer

0.3 mm/km10Level control and settlement monitoring
EQ-SV-04

Field Materials Laboratory

[Sample] Equipped facility

Concrete, soil and aggregate testing3On-site quality control
EQ-SV-05

Non-Destructive Testing Set

[Sample] Major manufacturer

UPV, rebound, cover meter, half-cell2Condition assessment and rehabilitation
EQ-SP-01

Diesel Generator

[Sample] Major manufacturer

125–250 kVA9Construction power at remote sites
EQ-SP-02

Dewatering Pump Set

[Sample] Major manufacturer

Various heads and flows14Excavation and cofferdam dewatering
EQ-SP-03

Air Compressor

[Sample] Major manufacturer

250–400 cfm6Breaking, shotcrete and cleaning

Quantities, makes and capacities above are placeholders. Plant schedules are checked at prequalification, so this register must be replaced with the verified fleet list — and kept current — before launch.

Engineering software

Design, analysis and control tools.

  • AutoCAD / Civil 3DDetailing, corridor design and quantity extraction
  • Revit / NavisworksBIM modelling and clash detection
  • STAAD.Pro / ETABSStructural analysis and design verification
  • Primavera P6 / MS ProjectProgramme development and earned-value control
  • GIS and drone photogrammetrySite survey, progress capture and volume measurement
  • Document management systemControlled drawing revision and submission tracking
Survey & testing

Measurement capability on site.

  • Total station and GNSS/RTK setting-out control
  • Digital levelling and settlement monitoring
  • Drone photogrammetry for progress and volumes
  • Field materials laboratory: concrete, soil, aggregate
  • Field density, CBR and gradation testing
  • Non-destructive testing for condition assessment
Surveyor using a total station to set out structural works
Concrete cube testing in a site materials laboratory
Workforce expertise

The disciplines we hold in-house.

Capability that has to be hired in for every project is not capability. These functions are permanent.

  • 01

    Civil & structural engineers

    Design coordination, site execution and supervision

  • 02

    Geotechnical specialists

    Foundations, slope stability and ground improvement

  • 03

    Surveyors

    Setting out, as-built and monitoring survey

  • 04

    QA/QC engineers

    Inspection and test plan execution and material control

  • 05

    HSE professionals

    Site safety, permits, audits and incident investigation

  • 06

    Quantity surveyors

    Measurement, valuation and commercial control

  • 07

    Plant operators & mechanics

    Certified operation and preventive maintenance

  • 08

    Skilled trades

    Steel fixing, carpentry, masonry, finishing and welding

Supply chain capacity

Material flow planned against the programme.

  • Central plant and procurement yard with covered material storage
  • Framework pricing for cement, reinforcement, aggregate and bitumen
  • Prequalified subcontractor pool assessed on quality and safety record
  • Import and customs documentation handled in-house
  • Seasonal stock buffers for sites with monsoon access restriction
  • Material traceability from mill or quarry certificate to installed work
Operational locations

Where the capacity sits.

  • Kathmandu

    Headquarters

    Corporate Headquarters

  • Pokhara

    Regional office

    Western Regional Office

  • Biratnagar

    Regional office

    Eastern Regional Office

  • Bharatpur

    Plant & procurement

    Central Plant & Procurement Yard

Start a project

Need specific plant evidenced for a tender?

We can issue the plant schedule with ownership documents, inspection certificates and current deployment.