Completed multi-span river bridge carrying a highway corridor over a wide river
CompletedTransportation2024Sample record

Trishuli Corridor River Bridge

A 180-metre, four-span river crossing replacing a seasonal causeway that closed the corridor for up to eleven weeks each monsoon. Substructure was built inside a single low-flow window using staged cofferdams.

Project data

Client
[Sample] Provincial Road Directorate
Location
Nuwakot, Bagmati Province
Sector
Transportation
Contract type
Item-rate construction contract
Duration
26 months
Completion
Completed · 2024
Contract value
[Sample] NPR 1.2 billion

Scope of work

  • Well foundations to 22 m depth in mixed river-bed material
  • Four RCC piers and two abutments with wing walls
  • Four-span prestressed girder superstructure, 180 m total length
  • Bearings, expansion joints and deck waterproofing
  • 1.4 km of approach road, drainage and river-training works
The challenge

What made this difficult.

  • 01

    The river-bed working window was limited to a 5-month low-flow period; missing it would have added a full year to the programme.

  • 02

    Sub-soil investigation showed a boulder layer at variable depth, making sinking rates unpredictable across the four foundations.

  • 03

    The existing causeway had to remain open to local traffic throughout construction.

The engineering solution

What we did about it.

  • 01

    Foundation sequence was re-planned to sink two wells concurrently with independent cofferdams, doubling the effective use of the low-flow window.

  • 02

    A chiselling and grabbing method with pre-positioned standby plant kept sinking progress through the boulder layer without stopping the sequence.

  • 03

    Girder casting moved to an off-site bed on the true left bank, decoupling superstructure production from river conditions.

  • 04

    The causeway was retained as a controlled single-lane crossing with scheduled closure windows published to the community two weeks in advance.

Key outcomes

  • Span length

    180 m

    Four prestressed girder spans

  • Completed

    Ahead of programme

    Handover 6 weeks early

  • Corridor closure

    Eliminated

    Previously up to 11 weeks a year

  • Lost-time injuries

    0

    Over 26 months

Safety performance

  • Zero lost-time injuries recorded over 26 months of construction
  • Water rescue team and standby boat maintained during all in-river work
  • Independent design check on every cofferdam and staging arrangement
  • Daily pre-task briefing for all lifting and in-water activities

Sustainability measures

  • Excavated river material screened and reused as fill in the approach embankments
  • Sediment control barriers maintained downstream of all in-river excavation
  • Fuel and oil storage bunded and located outside the flood-risk zone
  • Local labour engaged for approach works and river-training gabion construction
Before & after

The change on the ground.

The original seasonal causeway crossing, partially submergedBefore
The completed four-span bridge carrying two-way trafficAfter

The seasonal causeway before construction, and the completed crossing providing year-round access.

Project gallery

During construction.

Well foundation sinking operation inside a cofferdam during the low-flow season
Well foundation sinking operation inside a cofferdam during the low-flow season
Prestressed girder being lifted into position by crawler crane
Prestressed girder being lifted into position by crawler crane
Deck reinforcement and formwork prior to the pour
Deck reinforcement and formwork prior to the pour
Approach road embankment and drainage under construction
Approach road embankment and drainage under construction
Start a project

Have a project with similar constraints?

Send the brief. We will tell you what the delivery risks are before you commit to a programme.