Run-of-River Hydropower Civil Works

Headworks, waterway and powerhouse civil works for a run-of-river scheme, executed 47 km beyond the nearest sealed road with a fully self-sufficient site establishment.

Project data

Client
[Sample] Independent Power Producer
Location
Lamjung, Gandaki Province
Sector
Energy
Contract type
Civil works package under an EPC structure
Duration
34 months (in progress)
Completion
Ongoing · 2026
Contract value
[Sample] NPR 3.1 billion

Scope of work

  • 18 km of access track construction and slope protection
  • Diversion weir, intake structure and gate civil works
  • Desanding basin and 2.6 km headrace alignment structures
  • Forebay, penstock anchor and saddle blocks on steep terrain
  • Powerhouse substructure, superstructure and tailrace
The challenge

What made this difficult.

  • 01

    The site is inaccessible for roughly ten weeks each monsoon, compressing the productive season.

  • 02

    Penstock alignment crosses a slope with historic instability, requiring foundation redesign after ground investigation.

  • 03

    Cement and reinforcement delivery is limited by road load restrictions on the access route.

The engineering solution

What we did about it.

  • 01

    A seasonal programme front-loads concrete-intensive activities into the dry window, with monsoon reserved for tunnel-portal support, workshop and fabrication work.

  • 02

    Anchor block foundations were relocated and deepened following supplementary investigation, with slope drainage and instrumentation installed before construction.

  • 03

    On-site batching with an accredited field laboratory removed dependence on external concrete supply.

  • 04

    Material call-off is planned against the road restriction, with a staging yard at the last accessible point and a rolling four-week stock buffer.

Key outcomes

  • Access constructed

    18 km

    Including slope protection

  • Status

    Ongoing

    Headworks and waterway in progress

  • Site self-sufficiency

    Full

    Camp, batching, workshop, laboratory

  • Local workforce

    [Sample] 60%

    Of total site labour

Safety performance

  • Site medical post with trained responder and documented evacuation route to the nearest hospital
  • Flash-flood warning protocol with upstream observation and site-wide alert system
  • Working-at-height permits and rescue provision on all penstock alignment work
  • Slope monitoring with defined evacuation triggers during and after heavy rainfall

Sustainability measures

  • Spoil placed in designed, drained and revegetated disposal areas rather than side-cast
  • Sediment traps and settlement ponds on all discharge points to the river
  • Camp waste segregation with recyclables backhauled on returning supply vehicles
  • Local employment for access, gabion and revegetation works, with skills training provided
Project gallery

During construction.

Access track construction with slope protection on a steep hillside
Access track construction with slope protection on a steep hillside
Desanding basin reinforcement and formwork
Desanding basin reinforcement and formwork
Penstock anchor block construction on the alignment
Penstock anchor block construction on the alignment
Powerhouse substructure excavation and blinding
Powerhouse substructure excavation and blinding
Start a project

Have a project with similar constraints?

Send the brief. We will tell you what the delivery risks are before you commit to a programme.