UpcomingCommercial2027Sample record

Logistics Park Development

A planned logistics park with warehousing, container handling yard and administrative facilities, currently at design coordination stage ahead of mobilisation.

Project data

Client
[Sample] Private Logistics Operator
Location
Birgunj, Madhesh Province
Sector
Commercial
Contract type
Design-build (award expected)
Duration
24 months (planned)
Completion
Upcoming · 2027
Contract value
[Sample] NPR 2.0 billion

Scope of work

  • Three warehouse structures with clear-span steel roofs
  • Heavy-duty container handling yard and pavement
  • Administrative and customs facilities
  • Weighbridge, gatehouse and security infrastructure
  • Site drainage, utilities and internal circulation
The challenge

What made this difficult.

  • 01

    Yard pavement must carry container handler loads well beyond standard road design cases.

  • 02

    The site is low-lying with a monsoon flood risk requiring platform level review.

  • 03

    Customs and border-agency requirements affect layout and phasing.

The engineering solution

What we did about it.

  • 01

    Pavement design is being reviewed against actual handling equipment axle loads and turning patterns rather than generic traffic categories.

  • 02

    Platform levels are being set from flood record analysis, with drainage attenuation designed into the yard layout.

  • 03

    Agency requirements are being confirmed in writing before design freeze to avoid post-award layout change.

  • 04

    Long-lead structural steel is being scheduled at design stage so fabrication can start immediately on award.

Key outcomes

  • Status

    Upcoming

    Design coordination stage

  • Warehouses

    3

    Clear-span steel structures

  • Planned start

    [Sample] 2027

  • Programme

    24 months

    Planned duration

Safety performance

  • Safety-in-design review scheduled before design freeze
  • Construction phasing planned to separate heavy plant from any future operational traffic
  • Site-specific emergency plan to be issued at mobilisation
  • Contractor and vendor induction standard defined in the pre-construction plan

Sustainability measures

  • Warehouse roofs structurally provisioned for rooftop solar
  • Yard drainage with attenuation and oil interception before discharge
  • Platform levels set to avoid displacing flood water onto neighbouring land
  • Local employment and supplier targets to be agreed at contract award
Project gallery

During construction.

Topographic survey work across the development site
Topographic survey work across the development site
Ground investigation drilling for pavement and foundation design
Ground investigation drilling for pavement and foundation design
Design coordination review of the site layout
Design coordination review of the site layout