Production and logistics facilities built to the tolerances the installed equipment demands.

Overview

Industrial clients measure success by the date production starts. Construction is therefore sequenced to release areas for equipment installation as early as possible, rather than handing over a finished building at the end.

Foundation settlement limits, floor flatness and holding-down bolt positions come from vendor data, and are verified by survey before sign-off.

Who we work with

  • Manufacturers and processors
  • Logistics and warehousing operators
  • Cement, steel and materials producers
  • Agro-industrial and cold-chain businesses
Industrial plant under construction with steel structure and equipment foundations
What matters here

The three things that decide the outcome.

  • 01

    Equipment-led sequencing

    Zone-by-zone completion so vendor installation and commissioning start while construction continues elsewhere.

  • 02

    Dimensional accuracy

    Machine bases, crane rails and bolt templates surveyed and recorded against vendor tolerance before handover.

  • 03

    Brownfield control

    Permit-to-work interface with live operations, isolation procedures and protection of running plant.