Agro-Processing Facility
A processing and cold-storage facility with heavy machine foundations and 14,000 m² of industrial flooring, phased so that equipment installation began five months before construction completion.
Production and logistics facilities built to the tolerances the installed equipment demands.
Industrial clients measure success by the date production starts. Construction is therefore sequenced to release areas for equipment installation as early as possible, rather than handing over a finished building at the end.
Foundation settlement limits, floor flatness and holding-down bolt positions come from vendor data, and are verified by survey before sign-off.
Zone-by-zone completion so vendor installation and commissioning start while construction continues elsewhere.
Machine bases, crane rails and bolt templates surveyed and recorded against vendor tolerance before handover.
Permit-to-work interface with live operations, isolation procedures and protection of running plant.
Production facilities, warehousing and process infrastructure built to operational tolerances.
ViewVendor prequalification, material control and logistics planning that protect the programme.
ViewDesign review, temporary works, constructability and integrated programme, cost and interface control.
ViewSpeak with our team about your upcoming construction, engineering or infrastructure project.