Residential Township, Phase One

Six residential blocks totalling 240 units with associated site infrastructure, built to a benchmark-unit standard with phased handover by block.

Project data

Client
[Sample] Residential Development Company
Location
Lalitpur, Bagmati Province
Sector
Residential
Contract type
Construct-only, phased release
Duration
30 months (in progress)
Completion
Ongoing · 2027
Contract value
[Sample] NPR 1.6 billion

Scope of work

  • Six six-storey residential blocks, 240 units total
  • Site infrastructure: internal roads, drainage, water and sewerage
  • Community building and landscaped open space
  • Benchmark unit programme and unit-by-unit quality records
  • Phased handover with individual unit documentation packs
The challenge

What made this difficult.

  • 01

    Quality drift across 240 repeated units is the principal risk to handover.

  • 02

    Site infrastructure has to be complete before the first block is occupied, while later blocks are still under construction.

  • 03

    The site slopes 9 m across its length, requiring terraced platforms and retaining structures.

The engineering solution

What we did about it.

  • 01

    An approved benchmark unit fixes the accepted standard, and every unit is inspected against the same checklist derived from it.

  • 02

    Site infrastructure is being built in a permanent-first sequence so that occupied blocks are served by final, not temporary, services.

  • 03

    Terracing and retaining structures were designed to balance cut and fill on site, eliminating imported fill and disposal.

  • 04

    Wet areas are flood-tested and signed off before any covering work — a fixed hold point in the inspection plan.

Key outcomes

  • Units

    240

    Across six blocks

  • Earthworks

    Balanced

    No imported fill or off-site disposal

  • Handover

    Phased

    By block, with unit documentation packs

  • Status

    Ongoing

Safety performance

  • Scaffold handover tagging system across all six blocks
  • Separation of occupied-phase access from active construction zones
  • Edge protection and stair-core lighting maintained from first slab
  • Weekly coordinated safety walk with the client's representative

Sustainability measures

  • Cut-and-fill balanced on site, removing import and disposal haulage
  • Rainwater harvesting and recharge integrated into the site drainage
  • Construction waste segregation with reporting by stream
  • Landscaping specified with locally sourced, low-water species
Project gallery

During construction.

Terraced site platforms and retaining structures during earthworks
Terraced site platforms and retaining structures during earthworks
Residential block frame with formwork on the repeating floor cycle
Residential block frame with formwork on the repeating floor cycle
Internal road and drainage installation between blocks
Internal road and drainage installation between blocks
Benchmark unit finishing works for quality approval
Benchmark unit finishing works for quality approval
Start a project

Have a project with similar constraints?

Send the brief. We will tell you what the delivery risks are before you commit to a programme.