Urban Street & Drainage Upgrade

Reconstruction of 6.5 km of city streets with covered drainage, footpaths and utility coordination, sequenced so each street was opened only once.

Project data

Client
[Sample] Metropolitan City Office
Location
Bharatpur, Bagmati Province
Sector
Urban Development
Contract type
Municipal works contract
Duration
14 months
Completion
Completed · 2021
Contract value
[Sample] NPR 510 million

Scope of work

  • 6.5 km of street reconstruction with concrete and bituminous surfacing
  • Covered storm drainage with connection to the city outfall
  • Footpaths, kerbs, crossings and street furniture
  • Utility duct provision and coordinated service diversion
  • Junction improvement and road marking
The challenge

What made this difficult.

  • 01

    Water, power and telecom utilities all required work in the same alignment.

  • 02

    Recurring monsoon flooding at four junctions had defeated previous drainage attempts.

  • 03

    Streets pass through dense commercial frontage with daily trading.

The engineering solution

What we did about it.

  • 01

    A single coordinated programme was agreed with all three utility owners so each street was excavated once, with ducts laid for future service expansion.

  • 02

    Drainage was resized from updated catchment analysis; the four flood points needed capacity upstream, not larger outfalls.

  • 03

    Work proceeded in 150 m lengths with same-day temporary reinstatement, keeping commercial access open every evening.

  • 04

    Final surfacing followed only after all buried work was tested and signed off.

Key outcomes

  • Streets rebuilt

    6.5 km

  • Flood points

    4

    Resolved through upstream capacity

  • Excavations

    Single pass

    All utilities coordinated

  • Access

    Maintained daily

Safety performance

  • Pedestrian routes and shopfront access maintained continuously
  • Open excavations barricaded and lit overnight without exception
  • Confined-space controls on all drainage chamber work
  • Public liaison point staffed during working hours

Sustainability measures

  • Reclaimed pavement material reused in sub-base layers
  • Drainage designed to reduce recurrent flood damage and repair cycles
  • Street tree pits and planting integrated into the footpath design
  • Dust and noise controls agreed with the commercial associations
Project gallery

During construction.

Covered drainage construction along an urban street
Covered drainage construction along an urban street
Utility ducts laid in a coordinated single excavation
Utility ducts laid in a coordinated single excavation
Footpath and kerb construction with shopfront access maintained
Footpath and kerb construction with shopfront access maintained
Junction improvement works with new marking and signage
Junction improvement works with new marking and signage
Start a project

Have a project with similar constraints?

Send the brief. We will tell you what the delivery risks are before you commit to a programme.